Mason Adams Project @ Adair’s Saloon

When:
05/16/2020 @ 10:00 pm – 2:00 am America/Chicago Timezone
2020-05-16T22:00:00-05:00
2020-05-17T02:00:00-05:00
Where:
Adair's Saloon
2624 Commerce St, Dallas, TX 75226
USA

MAP returns to Adair’s!
Hailing from Dallas,Texas, Mason Adams Project is a 5- piece band, playing mostly original tunes by singer/songwriter, Mason Adams. MAP explores a rich blend of genres including: Folk, Southern Rock, Texas Country, and Bluegrass. This, paired with relatable lyrically- driven compositions, and 4 part vocal harmonies is what makes MAP appealing to a wide range of listeners. The listener is taken on a musical journey of life experiences through story telling and a dynamic musical approach. Beginning as the brain child of Mason Adams, the full band formed in 2017 and has gained popularity in the Dallas/Fort Worth music scene. This high energy act, with freight train rhythms, face- melting guitar solos, and shredding mandolin is sure to leave you wanting more.

MAP released their debut Ep “Lessons” on July
13th. Download link below.

https://masonadamsproject.bandcamp.com/album/lessons

Lessons
https://www.facebook.com/MasonAdamsProject/videos/338941526849670/

“Folk-rockers Mason Adams Project recently released their debut EP, showing off frontman Mason Adams’ songwriting chops and powerfully gritty, heartfelt vocals. MAP’s songs feature lyrics that are easy to understand and relate to — but also sophisticated enough to often be malleable to the listener’s own experiences, too. Musically, Mason Adams Project lives in the folk-rock space, its sound nicely balancing a forceful grunge-rock background with a bright and hopeful mandolin and often-sunny vocal harmonies. Adams’ own experiences as a public school teacher and coach lend his songwriting on universal topics a realistic yet encouraging air. I’d advise keeping an ear out for Mason Adams Project: this young Dallas-based band has a future so bright they’ve gotta wear shades.”
– Kristall Kuykendall, Dallas Observer, Live for Live Music